Indira Gandhi Super Thermal Power Station (IGSTPS)
3X500 MW Power Station
UNIT CONTROL ROOM
Aravali Power Company Pvt Ltd. (APCPL)
400KV / 132KV Switchyard
Aravali Power Company Pvt Ltd. (APCPL)
STAGE I: 1500 MW(3X500 MW)
Aravali Power Company Pvt Ltd. (APCPL)
APCPL Township
Aravali Power Company Pvt Ltd. (APCPL)

Performance Highlights

  1. Highest monthly DC of 106.38% achieved in Feb-14 since inception and is best in all NTPC stations during the month.
  2. Highest generation of 34.78 MU on a single day achieved on 17.06.2014 since inception.
  3. Highest monthly generation of 700.128 MU achieved in June 14 since inception.




APCPL designed by pixelwebtech.com